Reducing Process Setup in a Smart TV Card Factory

Item

Tipo do ITEM
Artigo Ciêntifico
Título do Artigo
Reducing Process Setup in a Smart TV Card Factory
Descrição
Abstract
Companies are looking for new ways to carry out their processes automatically and accurately. Thus,
the machines that are part of the process need to be stopped, called setup, so that they are prepared
to continue producing other products on the production line. This work was developed with the main
objective of showing the effect of reducing the setup time in a television factory, and as specific
objectives to present the concept of Fast Tool Change; present the negative effects of a production
that has a lengthy setup; punctuate the benefits of reducing setup time in a factory. The methodology
used is focused on exploratory research where it was necessary to visit the production line of a 32 ",
42", 50 "and 55" Smart TV board manufacturing company, in order to apply the data collection
instruments. To verify the failures resulting from the shutdowns and the problems that are related to
the production setup time, quality tools such as Ishikawa Diagram, 5W2H and before and after study
flowchart were used. As expected results, the company was able to reduce machine preparation
delays, batch delays became minimal.
Keyword: Production; Setup Time Reduction;
Abstract
Abstract
Companies are looking for new ways to carry out their processes automatically and accurately. Thus,
the machines that are part of the process need to be stopped, called setup, so that they are prepared
to continue producing other products on the production line. This work was developed with the main
objective of showing the effect of reducing the setup time in a television factory, and as specific
objectives to present the concept of Fast Tool Change; present the negative effects of a production
that has a lengthy setup; punctuate the benefits of reducing setup time in a factory. The methodology
used is focused on exploratory research where it was necessary to visit the production line of a 32 ",
42", 50 "and 55" Smart TV board manufacturing company, in order to apply the data collection
instruments. To verify the failures resulting from the shutdowns and the problems that are related to
the production setup time, quality tools such as Ishikawa Diagram, 5W2H and before and after study
flowchart were used. As expected results, the company was able to reduce machine preparation
delays, batch delays became minimal.
Keyword: Production; Setup Time Reduction;
Língua do arquivo
inglês
Data da Publicação
Ano 2019
Palavra-chave
Production
Setup Time Reduction
Autores
Diana Trindade Duarte
David Barbosa de Alencar
Alexandra Priscilla Tregue Costa
Antônio Estanislau Sanches
Local
ITEGAM - Manaus, 2019