ABSTRACT
This study presents a new method for load pre-dispatch considering the technical conditions of engines in thermoelectric power plants by combining several maintenance and diagnostic techniques and using computational intelligence. A diagnosis of the technical conditions of the engines is performed using a lubricant analysis, vibration analysis, and thermography. With these data from a statistical analysis, it is possible to predict when an engine will fail and to consider this phenomenon in the load pre-dispatch. To increase the engine reliability and power supply, a Maintenance Management Program (MMP) is developed using Management tools, applying only 4 Total Productive Maintenance (TPM) pillars and combining them with predictive maintenance and diagnostics, thus reducing failures in plant equipment. Some results achieved after this implementation are as follows: a reduction in the annual cost of maintenance, a reduction in the corrective maintenance, an increase in the Mean Time between Failures (MTBF) and a decrease in the Mean Time to Repair (MTTR) in all areas. In addition, the pre-dispatch ensures that the demanded power is met with a high degree of reliability and quality and at minimal cost.
 
INDEX TERMS Economic Load Dispatch, Management Maintenance Program, Electric Generators, TPM Power Plants and Fuzzy Logic.
Abstract
ABSTRACT
This study presents a new method for load pre-dispatch considering the technical conditions of engines in thermoelectric power plants by combining several maintenance and diagnostic techniques and using computational intelligence. A diagnosis of the technical conditions of the engines is performed using a lubricant analysis, vibration analysis, and thermography. With these data from a statistical analysis, it is possible to predict when an engine will fail and to consider this phenomenon in the load pre-dispatch. To increase the engine reliability and power supply, a Maintenance Management Program (MMP) is developed using Management tools, applying only 4 Total Productive Maintenance (TPM) pillars and combining them with predictive maintenance and diagnostics, thus reducing failures in plant equipment. Some results achieved after this implementation are as follows: a reduction in the annual cost of maintenance, a reduction in the corrective maintenance, an increase in the Mean Time between Failures (MTBF) and a decrease in the Mean Time to Repair (MTTR) in all areas. In addition, the pre-dispatch ensures that the demanded power is met with a high degree of reliability and quality and at minimal cost.
 
INDEX TERMS Economic Load Dispatch, Management Maintenance Program, Electric Generators, TPM Power Plants and Fuzzy Logic.
Língua do arquivo
inglês
Data da Publicação
Ano Desconhecido
Autores
Milton Fonseca Junior1
Ubiratan Holanda Bezerra2
Jorge de Almeida Brito Junior3
(Member
IEEE)
Jandecy Cabral Leite3
(Member
IEEE)
and Manoel Henrique Reis Nascimento3
Local
UFPA - 2017
Coleções
ARTIGOS