Pre-dispatch of Load in Thermoelectric Power Plants Considering Maintenance Management using Fuzzy Logic
Item
-
Tipo do ITEM
-
Artigo Ciêntifico
-
Título do Artigo
-
Pre-dispatch of Load in Thermoelectric Power Plants Considering Maintenance Management using Fuzzy Logic
-
Descrição
-
ABSTRACT
This study presents a new method for load pre-dispatch considering the technical conditions of engines in thermoelectric power plants by combining several maintenance and diagnostic techniques and using computational intelligence. A diagnosis of the technical conditions of the engines is performed using a lubricant analysis, vibration analysis, and thermography. With these data from a statistical analysis, it is possible to predict when an engine will fail and to consider this phenomenon in the load pre-dispatch. To increase the engine reliability and power supply, a Maintenance Management Program (MMP) is developed using Management tools, applying only 4 Total Productive Maintenance (TPM) pillars and combining them with predictive maintenance and diagnostics, thus reducing failures in plant equipment. Some results achieved after this implementation are as follows: a reduction in the annual cost of maintenance, a reduction in the corrective maintenance, an increase in the Mean Time between Failures (MTBF) and a decrease in the Mean Time to Repair (MTTR) in all areas. In addition, the pre-dispatch ensures that the demanded power is met with a high degree of reliability and quality and at minimal cost.
INDEX TERMS Economic Load Dispatch, Management Maintenance Program, Electric Generators, TPM Power Plants and Fuzzy Logic.
-
Abstract
-
ABSTRACT
This study presents a new method for load pre-dispatch considering the technical conditions of engines in thermoelectric power plants by combining several maintenance and diagnostic techniques and using computational intelligence. A diagnosis of the technical conditions of the engines is performed using a lubricant analysis, vibration analysis, and thermography. With these data from a statistical analysis, it is possible to predict when an engine will fail and to consider this phenomenon in the load pre-dispatch. To increase the engine reliability and power supply, a Maintenance Management Program (MMP) is developed using Management tools, applying only 4 Total Productive Maintenance (TPM) pillars and combining them with predictive maintenance and diagnostics, thus reducing failures in plant equipment. Some results achieved after this implementation are as follows: a reduction in the annual cost of maintenance, a reduction in the corrective maintenance, an increase in the Mean Time between Failures (MTBF) and a decrease in the Mean Time to Repair (MTTR) in all areas. In addition, the pre-dispatch ensures that the demanded power is met with a high degree of reliability and quality and at minimal cost.
INDEX TERMS Economic Load Dispatch, Management Maintenance Program, Electric Generators, TPM Power Plants and Fuzzy Logic.
-
Língua do arquivo
-
inglês
-
Data da Publicação
-
Ano Desconhecido
-
Autores
-
Milton Fonseca Junior1
-
Ubiratan Holanda Bezerra2
-
Jorge de Almeida Brito Junior3
-
(Member
-
IEEE)
-
Jandecy Cabral Leite3
-
(Member
-
IEEE)
-
and Manoel Henrique Reis Nascimento3
-
Local
-
UFPA - 2017